Cádiz E-Methanol

Spain

SolWinHy Cádiz, our pioneering plant, will produce 29k tons of E-methanol annually.

Project

SolWinHy Cádiz is a cutting-edge green methanol facility located in Arcos de la Frontera, Cádiz, Spain, and marks the first of several renewable energy projects. The plant will produce 29,000 tons of E-Methanol annually, powered entirely by renewable sources: a 130 MW solar PV system and a 54 MW wind farm. Operating independently from the national grid in island mode, the facility ensures that all hydrogen and methanol production is 100% renewable. An 80 MW electrolyzer produces green hydrogen, which is combined with biogenic CO2 to create methanol. Situated on 463 hectares of leased agricultural land, the plant is positioned to supply green methanol to Germany, with negotiations with potential off-takers already in progress.

Highlights

The SolWinHy Cádiz e-methanol facility will produce 29,000 tons of RFNBO-compliant E-Methanol annually, powered by a 130 MW solar PV system and a 54 MW wind farm, with production slated to start in early 2027.

29
Thousand tons of e-methanol annually
130
MW solar pv plant
54
MW wind farm
Milestones

Project milestones are progressing as planned, keeping the facility on schedule to begin E-methanol production by early 2027.

Land

The option to exercise the signing of the final lease agreement has been signed for a lease period of 35 years with the possibility of extending the term for five additional years​

Off-taker

Negotiations are in advanced stages with various offtakers. Termsheet Isexpected to be signed by  Q3 2024​.

Permitting

The environmental permit is in last stage with final approval expected by end of August. Following is the water and construction permit to be received early 2025.

Technical

FEED ongoing to be completed by Q3 2024​ and pre-technical due diligence has already been carried out.

Financing

Discussions are ongoing with lenders and investors, with term sheets received from banks and investors currently in the due diligence phase